Springfield Central State High School

CLIENT

Paynter Dixon

DESCRIPTION

COBiE was engaged to design additional buildings for this integral school within a fast growing community. The project consisted of a dynamic two-story Performing Arts building designed for creativity and expression. The ground floor features a state-of-the-art stage for dance and drama performances, while the upper level houses a cutting-edge multimedia room and a high-tech control room for seamless production experiences.

 
The modern four-story education facility with 17 versatile GLAs, thoughtfully designed to adapt and grow. Future-ready, the ground and fourth levels offer the potential for additional classrooms. The building also includes staff rooms and essential support spaces, ensuring a collaborative learning environment.


Seamlessly integrating with existing infrastructure, the development includes a covered walkway for easy access, landscaped areas with secondary pathways, seating zones, and outdoor spillout spaces. Plus, the expansion of essential services ensures a smooth transition into the future.

ROLE

Architect | Interior Design

TYPE

Design & Construct

COBiE Group

We acknowledge the traditional owners of the lands on which we practice and pay our respects to the ancestors and descendants for their continual cultural and spiritual connections to country. we are committed to actively contributing to reconciliation by listening, learning, and recognising the valuable contributions of first nations’ stories and insights.

PRIVACY POLICY    I    ©2026 COBIE GROUP