Mooloolaba State School 

CLIENT

Department of Education 

DESCRIPTION

The construction was completed in April 2022 using a Traditional procurement method. The school sits less than 200 metres away from the Mooloolaba beach and this satisfied the criteria to use the Ultra range of colorbond products (roof sheeting, gutters downpipes and facias) with enhanced corrosive resistance. The coastal location also dictated selection of other materials such as using the highest form of corrosion resistant Stainless Steel (316) and using FC for external soffits rather than steel sheeting. Hollow section aluminium powder coated batten screening was used in preference to perforated sheet metal where possible due to its better corrosive properties over time. 

The building location was affected by a trunk sewer which would take significant cost to divert. The sewer line was kept and the building was moved further away from the existing buildings. This decision value added to the project by creating space for a covered play. 

ROLE

Principal Consultant

TYPE

Traditional

COBiE Group

We acknowledge the traditional owners of the lands on which we practice and pay our respects to the ancestors and descendants for their continual cultural and spiritual connections to country. we are committed to actively contributing to reconciliation by listening, learning, and recognising the valuable contributions of first nations’ stories and insights.

PRIVACY POLICY    I    ©2026 COBIE GROUP